Page image

8.—14.

List of Applications and Advances— continued.

3

Provisionally granted or refused. Lvances. Local Authority. Amount applied for. Result ol Poll or I'etition. New Loans. L^& Purposes of Loan. Bemarks. COU] ;TY COUN' IILS— conti: mod. £ 32,079 70 No poll required Ditto £ 16,834 70 £ 10,310 Construction of Maungaraupi Road Constructon of West Eoad Construction of roads in Hunterville Township. Construction of roads in Hunterville Township, extension Construction of West Road. Construction of Finnerty Road. Construction of Beaconsfield, Ahuroa, Manawawiri Roads Construction of Douglas Road Construction of Standish Eoad Construction of part of Opunake Road Construction of part of Mountain Road Public work on Poto Road Construction of Cheal Road. Construction of Waiwiri and Makuri Roads. Construction of Toko Road. Widening Thompson's Track Construction of drayroad from Whareohine, and two bridle-tracks Construction of drayroad from Tokomaru to Whareohine. Construction of Lower Waihao irrigation works. Construction of horse-bridge over Motueka River. Construction of road : " round the rocks " Construction of Danevirke - Weber Road Ditto. Metalling Te Ore Ore -Bideford Road Metalling Castle Hill Road Construction of Pori and Saundera's Road deviations Forming Ihuraua Rd. Forming and bridging Saunders's Rd. Construction of Eke-tahuna-Tinui Rd. Ditto Brought forward Kangitikei G. Under section 22 of the Act. Ditto. u • • 80 G. 80 2,500 G. Carried 2,500 Uncompleted. 1,000 P.G. 300 Stratford 1,270 G. Carried 1,270 Uncompleted. 2,000 P.G. • • • 1,250 P.G. tt • • 200 P.G. // • • 330 P.G. No poll required Ditto Under section 22 of the Act. Ditto. 220 P.G. N • • 300 P.G. 1,200 Uncompleted. 1,530 It • • 2,000 Uncompleted. Tauranga 1,000 P.G. Waiapu 1,600 R. Carried Not in compliance with terms of the Act. 1,100 G. 100 Waimate 450 Waimea 400 G. Carried 400 Under section 22 of the Act. Ditto. 140 P.G. No poll required Ditto Waipawa COO G. 600 Wairarapa North 500 P.G. 1,000 Uncompleted. 400 P.G. Carried v 1,300 P.G. 150 3,222 P.G. P.G. 300 Under section 22 of the Act. 250 Wairoa 4,000 P.G. Carried Construction of bridge over Mohaka River on Napier-Wairoa Road For road-formation. Waitotara Rejected .. Carried forward 2,000 58,311 P.G. 21,854 17,340