Article image
Article image
Article image
Article image

BRIDGE CARRIED AWAY

FLOODING NEAR WANGANUI MANY ROADS BLOCKED (By Telegram.—Press Association) WANGANUI, Thursday Heavy rain fell throughout the district all night and is continuing. At Pipiriki the Wanganui River had risen 13 feet at noon and is still rising. The Wangaehu River is in high flood, much debris coming down. Half of the temporary bridge built near the site of the railway bridge to be built in connection with the Denlair deviation has been carried away. A public works gang is salvaging all possible. The railway line between Marton and Rata is under water through a slip on the Wangaehu bank. The Wanganui-'Raetihi road is blocked and also the roads from Wanganui to Pipiriki and Wanganui to Mangamahu. The Awahuri-Marton road is also blocked.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/WT19390818.2.110

Bibliographic details

Waikato Times, Volume 125, Issue 20886, 18 August 1939, Page 9

Word Count
125

BRIDGE CARRIED AWAY Waikato Times, Volume 125, Issue 20886, 18 August 1939, Page 9

BRIDGE CARRIED AWAY Waikato Times, Volume 125, Issue 20886, 18 August 1939, Page 9