Article image
Article image
Article image
Article image

TEMPORARY HOLD UP

WORK O lt HILL. REMOVAL OVERHAUL OR MACHINERY With the break In the fine weather which has for so long favoured the work of excavating and removing Garden Place Hill, cartage of spoil has been temporarily interrupted and uo carting or excavating was done last evening or to-day. Advantage, how ever, is being taken by the subcontractor in charge of the excavation, Mr P. L. Guillard, to overhaul the three meehanJeal excavators during the temporary stoppage so that the machines wjj be ready once more to work at full capacity when more favourable conditions for cartage obtain. It is understood that to Improve access to the faces being worked at the rear of the hill temporary tracks of loose meial may be laid for use by the trucks in wet weather.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/WT19390422.2.27

Bibliographic details

Waikato Times, Volume 124, Issue 20786, 22 April 1939, Page 6

Word Count
134

TEMPORARY HOLD UP Waikato Times, Volume 124, Issue 20786, 22 April 1939, Page 6

TEMPORARY HOLD UP Waikato Times, Volume 124, Issue 20786, 22 April 1939, Page 6