Article image
Article image
Article image
Article image

MOANATAIRI.

Operations at the battery were suspended for a few hours, owing to breaking one of the main pipes from reservoir to boilers. This mishap arose when tapping for the purpose of connecting service pipe, in order to comply with the stipula tions that three standpipes be erected for public benefit on the Tararu road. The mill has started again on their own stuff, and five head for the Long Drive.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/THS18750923.2.25.3

Bibliographic details

Thames Star, Volume VII, Issue 2097, 23 September 1875, Page 3

Word Count
71

MOANATAIRI. Thames Star, Volume VII, Issue 2097, 23 September 1875, Page 3

MOANATAIRI. Thames Star, Volume VII, Issue 2097, 23 September 1875, Page 3