Article image
Article image
Article image
Article image

BRIGHT SMILE.

The only work now bciiig performed in the Company's mine is in the repair of the shaft, for the resumption of sinking. The tramway from the poppet-heads to the new" battery is completed, the boilers are fixed, and everything, it is expected, will be ready for a vigorous start by the -end of this month.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/THS18750506.2.15.1

Bibliographic details

Thames Star, Volume VII, Issue 1977, 6 May 1875, Page 2

Word Count
57

BRIGHT SMILE. Thames Star, Volume VII, Issue 1977, 6 May 1875, Page 2

BRIGHT SMILE. Thames Star, Volume VII, Issue 1977, 6 May 1875, Page 2