Article image
Article image
Article image
Article image

DOWNLANDS SCHEME

Completion When Pipes Arrive (F O P R.) WELLINGTON. Sept. 26. A reply was given hi the House today bv the Hon. R. Semple to a question bv Mr D c. Kidd as to whether, as soon as pipes became available, tne Minister would proceed with the Downlands water scheme. “The question," said Mr bempie apparently refers to the extension ol the Downiands water sunnlv scheme covering the foothills between the Pareora and Otaio Rivers, m the waimate County. The reservoir from which water will be supplied to tin. area has been constructed, the necessary concrete water trough-- hate been made, and certain of the largest diameter pipes have been procured. The small diameter heavy-gauee sary was ordered from England some months ago. and when this is' de it is intended to complete the water supply to the area concerned. ’

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/THD19450927.2.106

Bibliographic details

Timaru Herald, Volume CLVIII, Issue 23316, 27 September 1945, Page 6

Word Count
142

DOWNLANDS SCHEME Timaru Herald, Volume CLVIII, Issue 23316, 27 September 1945, Page 6

DOWNLANDS SCHEME Timaru Herald, Volume CLVIII, Issue 23316, 27 September 1945, Page 6