HYDRO-ELECTRIC DEVELOPMENT IN NEW ZEALAND: VIEWS OF BIG SCHEME ON THE WAITAKI. Members of Hie South Canterbury Chamber of Commerce Paid a Visit to the Waitaki Hydro-Electric Scheme on Thursday last. Left: Huge Framework for Scroll Casing for Turbine into which concrete is to be poured. Centre: View of Site of Dam showing in Background, Extensive Settlements for Housing Workers. Right: One of the large Buckets used in Dredging Shingle in Preparation for Construction of 80ft Dam,
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/THD19300308.2.108.1
Bibliographic details
Timaru Herald, Volume CXXV, Issue 18512, 8 March 1930, Page 16 (Supplement)
Word Count
77HYDRO-ELECTRIC DEVELOPMENT IN NEW ZEALAND: VIEWS OF BIG SCHEME ON THE WAITAKI. Members of Hie South Canterbury Chamber of Commerce Paid a Visit to the Waitaki Hydro-Electric Scheme on Thursday last. Left: Huge Framework for Scroll Casing for Turbine into which concrete is to be poured. Centre: View of Site of Dam showing in Background, Extensive Settlements for Housing Workers. Right: One of the large Buckets used in Dredging Shingle in Preparation for Construction of 80ft Dam, Timaru Herald, Volume CXXV, Issue 18512, 8 March 1930, Page 16 (Supplement)
Using This Item
Stuff Ltd is the copyright owner for the Timaru Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.