Article image
Article image
Article image
Article image

NORTHCOTE HIGHWAYS

CONCRETE SCHEME DEFERRED Lake and Onewa Roads, Xorthcce, having been declared main highways, a subsidy of £ for £ for permanent construction, or £3 for £1 for maintenance has been offered by the Main Highways Board. It is the opinion of Cr. F. Wilson that the financial position of the borough does not warrant the permanent construction in concrete? of Lake and Onewa Roads on the £ for £ basis j offered, and that the £ 3 for £ 1 offered for maintenance will meet the requirements of the borough for the time being. At last evening’s meeting of tho council he moved: “That in view of the substantial cost to ratepayers to be incurred by a reconstruction scheme on the permanent basis, by comparison with the maintenance scheme, that this council is of opinion that no further action be taken in respect of the loan proposals on the permanent The speaker said the works proposed aggregated £32,571. of which the council would have to find nearly £20,000. The Mayor, Mr. A. E. Greenslade, suggested that Cr. Wilson supply the town clerk with a copy of his data, and each member Df the council would be provided with a copy. The question could then be fully considered in committee at an early date. This was agreed to.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/SUNAK19290612.2.148

Bibliographic details

Sun (Auckland), Volume III, Issue 687, 12 June 1929, Page 11

Word Count
213

NORTHCOTE HIGHWAYS Sun (Auckland), Volume III, Issue 687, 12 June 1929, Page 11

NORTHCOTE HIGHWAYS Sun (Auckland), Volume III, Issue 687, 12 June 1929, Page 11