Article image
Article image
Article image
Article image

TAKAPUNA DRAINAGE

PIPELINE COMPLETED Mr. Sling er, the engineer of the Takapuna Borough Council, reported this morning to the Mayor of tin* borough. Mr. J. W. Williamson, th.ii the bolting up of the long sower outfall pipe-line had been successful!' completed at the end of the Milford storage culvert at Black Rock The pipe line, which is over 500 feet in length, had been assembled and tested on Takapuna Beach, and was floated round on Tuesday last with a favourable tide, and laid in position, and by intensive work since the desired end of the most necessary and important work reached finality earlv this morning. There are two outfalls in the system —one as above and the other at St. Leonard’s, and the work meets with the approval of the officials of the Health Department and the Harbour Board. •

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/SUNAK19290418.2.131

Bibliographic details

Sun (Auckland), Volume III, Issue 641, 18 April 1929, Page 11

Word Count
139

TAKAPUNA DRAINAGE Sun (Auckland), Volume III, Issue 641, 18 April 1929, Page 11

TAKAPUNA DRAINAGE Sun (Auckland), Volume III, Issue 641, 18 April 1929, Page 11