TANGARAKAU COAL
EGMONT COLLIERIES’ MINE. in regard to iigmout Coilcne» Ltd s coal-mining nglits at laugarafeau a great deal of earthwork has now been completed in connection with the construction of the steam tramway from Tangarakau Flat to the mine. A commencement will shortly be made) with the laying of the rails on the first section. The greater portion of the trucks have been ordered and the locomotive has already arrived in the Dominion from England. The construction of the jlarge bridge over the langarakau River will be put in hand very shortas most of trie hardwood required has already reached the Flat.. Xu the meantime the mine is being worked to a limited extent in connection with the supply of coal to the Public Works Department, some 700 tons having been delivered during January. No attempt will be made to increase the present output until the f completion of the steam tramway to he Flat. Several trial trucks of coal have been sent down the 1 line at the request of certain large consumers and the results have been very satisfactory indeed.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/STEP19290213.2.20
Bibliographic details
Stratford Evening Post, Issue 35, 13 February 1929, Page 4
Word Count
183TANGARAKAU COAL Stratford Evening Post, Issue 35, 13 February 1929, Page 4
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.