Article image
Article image
Article image
Article image

MAIN HIGHWAYS

ESTIMATED REQUIRE)!ENTS. TARANAKI DISTRICT. The estimated amounts required for construction, reconstruction and improvement of Main Highways m the No. 7 Highways district arc as under; AuCjkfland- Wellington (Mia Taranaki),, (free. £8791; £3 for £l, £3000; £2 for £l, £1000; £1 for £l, £7304), £20,095. Lepperton Junction-Hawera (via Opunake), t£3 for £l, -IOSS, £-• £l, £22,821), £23,900. New P'lymouth-Kaimata (via Inglewood), (£3 for £l. £2280; £1 toi £l, £5485), £7705. Ohnra Road (free), £IO,OOO. Eltham-Opuuake (£1 f° r ■ Cl > £3IOO. Stratfcrd-Opunake (£1 for £l)h £l5O. Pukearuhe Road (£1 for £ll 11000. Shoot Road (£1 for £1), £ISOO. Oxford-Saunders (£1 for £1), £225. Engineering surveys (free) £2O. Total £07,704.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/STEP19280926.2.38

Bibliographic details

Stratford Evening Post, Issue 41, 26 September 1928, Page 5

Word Count
108

MAIN HIGHWAYS Stratford Evening Post, Issue 41, 26 September 1928, Page 5

MAIN HIGHWAYS Stratford Evening Post, Issue 41, 26 September 1928, Page 5