Article image
Article image
Article image
Article image

PILOT TUNNEL UNDER THE THAMES

(Received October 7, 6.30 p.m.) RUGBY, October 6. The pilot boring of the Dartford to Purfleet tunnel under the Thames, which will join the counties of Essex and Kent, was completed yesterday, when the last five-foot curtain of chalk was broken. There was an error of only three-eighths of an inch in the line and three-sixteenths of an inch in the level of the tunnel when the two borings from the Essex and Kent sides met. The total length of the pilot tunnel is 2832 ft.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/ST19381008.2.46

Bibliographic details

Southland Times, Issue 23634, 8 October 1938, Page 7

Word Count
91

PILOT TUNNEL UNDER THE THAMES Southland Times, Issue 23634, 8 October 1938, Page 7

PILOT TUNNEL UNDER THE THAMES Southland Times, Issue 23634, 8 October 1938, Page 7