Article image
Article image
Article image
Article image

BITUMEN ON ALL ROADS

ESTIMATE OF COST DELAY BY FLOOD WORK An estimate of the cost of bitumen surfacing all roads within the borough was to have been submitted to the Gisborne Borough Council last night by the borough engineer, Mr. E. R. Thomas. The contemplated report however, ! was not available, Mr. Thomas stating | that the extra work in connection with the water supply at Waingake as a result of the flood prevented him completing the estimate. The information asked for would be submitted to the next meeting of the council. Mr. Thomas added-

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/PBH19380504.2.167

Bibliographic details

Poverty Bay Herald, Volume LXV, Issue 19622, 4 May 1938, Page 13

Word Count
94

BITUMEN ON ALL ROADS Poverty Bay Herald, Volume LXV, Issue 19622, 4 May 1938, Page 13

BITUMEN ON ALL ROADS Poverty Bay Herald, Volume LXV, Issue 19622, 4 May 1938, Page 13