Article image
Article image
Article image
Article image

A VIEW OF THE KAWARAU RIVER, SHOWING WHERE THE PILLARS WERE PUT IN TO RAISE THE LEVEL OF THE WATER. race seen on the far bank. Hie water power is to be used to generate electric power to force the water flora the river up pipes on to the adjacent fruit lands.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/OW19210419.2.118.27

Bibliographic details

Otago Witness, Issue 3501, 19 April 1921, Page 31

Word Count
52

A VIEW OF THE KAWARAU RIVER, SHOWING WHERE THE PILLARS WERE PUT IN TO RAISE THE LEVEL OF THE WATER. race seen on the far bank. Hie water power is to be used to generate electric power to force the water flora the river up pipes on to the adjacent fruit lands. Otago Witness, Issue 3501, 19 April 1921, Page 31

A VIEW OF THE KAWARAU RIVER, SHOWING WHERE THE PILLARS WERE PUT IN TO RAISE THE LEVEL OF THE WATER. race seen on the far bank. Hie water power is to be used to generate electric power to force the water flora the river up pipes on to the adjacent fruit lands. Otago Witness, Issue 3501, 19 April 1921, Page 31