Article image
Article image
Article image
Article image

RAILWAY CONSTRUCTION

TANEATUA-OPOTIKI LINE AERIAL SURVEY TO BE MADE (Per United .Press Association) WELLINGTON. June 1. The Prime Minister (Mr M. J. Savage) stated after a Cabinet meeting to-day that it had been decided J to make an aerial survey of the railway route between Taneatua and Opotiki (Auckland district), with the idea of having the line completed.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/ODT19380602.2.141

Bibliographic details

Otago Daily Times, Issue 23516, 2 June 1938, Page 15

Word Count
58

RAILWAY CONSTRUCTION Otago Daily Times, Issue 23516, 2 June 1938, Page 15

RAILWAY CONSTRUCTION Otago Daily Times, Issue 23516, 2 June 1938, Page 15