WATERLOO BRIDGE
WORK OF DEMOLITION (British Official Wireless.). • RUGBY, June. 19. (Received June 20, at 5.5 p.m.) The preliminary work of the demolition of Waterloo bridge willv be begun to-morrow, and the bridge will be closed to traffic on Friday. Rendell/'Palmer, and Tritton will be the engineers lor the demolition of the existing bridge and the erection of the new one.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ODT19340621.2.76
Bibliographic details
Otago Daily Times, Issue 22294, 21 June 1934, Page 7
Word Count
61WATERLOO BRIDGE Otago Daily Times, Issue 22294, 21 June 1934, Page 7
Using This Item
Allied Press Ltd is the copyright owner for the Otago Daily Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.