Steel Lattice Bridge erected over the main line of the railway at Kavensbourne in connection with the new fertiliser works. '
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ODT19301202.2.24.1
Bibliographic details
Otago Daily Times, Issue 21198, 2 December 1930, Page 6
Word Count
20Steel Lattice Bridge erected over the main line of the railway at Kavensbourne in connection with the new fertiliser works. ' Otago Daily Times, Issue 21198, 2 December 1930, Page 6
Using This Item
Allied Press Ltd is the copyright owner for the Otago Daily Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.