HOSPITAL CONTRACT
GOOD PROGRESS MADE
Excellent progress is Being made with the new buildings which are being erected in front of the Wellington Hospital. These comprise the new administrative block and the genitourinary block, the contract price nf whinli is £146,355. A large number of 27ft concrete piles ai’o being made on the site for the administrative block, and u number of them are already maturing. They talco three months to dry and mature properly. Good progress has also been made with the foundations of the genitourinary block. It is for the new build irgs that the board is offering debentures on very favourable terms.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZTIM19250925.2.63
Bibliographic details
New Zealand Times, Volume LII, Issue 12252, 25 September 1925, Page 6
Word Count
105HOSPITAL CONTRACT New Zealand Times, Volume LII, Issue 12252, 25 September 1925, Page 6
Using This Item
Stuff Ltd is the copyright owner for the New Zealand Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.