Article image
Article image
Article image
Article image

BIRKENHEAD BOROUGH

DRAINAGE COMPLETED All contracts for tho installation of tho sewerage system at Birkenhead have been completed, and it is anticipated that from next Monday connections will bo permitted to tho reticulation in tho pumping area between Marama Terrace and the ferry wharf. Tho engineer, Mr. 1?.. I'. Worlcy, advised tho Borough Council' last night that tho total contract amount for reticulation and outfall works was £26,919 and the total cost £26,524. The commissioner of transport, Mr. G. L. Laurenson, advised that control of traffic at Birkenhead was now supervised by the chief traffic inspector at Auckland; _ '■ • It was decided to afford the fullest co-operation in the road safety campaign and to send congratulations to tho Minister of Transport, the Hon. 11. Semple, for tho energetic efforts employed to reduce the toll of tho road.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19381208.2.196

Bibliographic details

New Zealand Herald, Volume LXXV, Issue 23215, 8 December 1938, Page 22

Word Count
136

BIRKENHEAD BOROUGH New Zealand Herald, Volume LXXV, Issue 23215, 8 December 1938, Page 22

BIRKENHEAD BOROUGH New Zealand Herald, Volume LXXV, Issue 23215, 8 December 1938, Page 22