Article image
Article image
Article image
Article image
Article image
Article image

DELAYED IN TUNNEL.

MISHAP TO ELECTRIC TRAIN.

STEAM ENGINES REQUISITIONED. [BY TELEGRAPH. —PRESS ASSOCIATION.] CHRISTCHURCH, Sunday. A mechanical defect in an electric locomotive which drew the early goods train to Lyttelton yesterday morning caused a hold-up at an awkward moment. The train stopped in the middle of the tunnel, and it was not till two steam locomotives arrived from Lyttelton and towed the train through that the (rouble was overcome. • 1

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19290812.2.58

Bibliographic details

New Zealand Herald, Volume LXVI, Issue 20331, 12 August 1929, Page 8

Word Count
71

DELAYED IN TUNNEL. New Zealand Herald, Volume LXVI, Issue 20331, 12 August 1929, Page 8

DELAYED IN TUNNEL. New Zealand Herald, Volume LXVI, Issue 20331, 12 August 1929, Page 8