Article image
Article image
Article image
Article image
Article image
Article image

FAULTS IN WATER TUNNEL.

i'-:. j - • AV ; REPAIR WORK IN PROGRESS.

[By TEIiEGBAfH.--OWN CORRESPONDENT.] : CHRISTGHURCH, Wednesday.. As aprecaution against the .hillside becoming _ saturated with water and possibly causing slips,. steps are being taken by the Public Works Department to minimise the leakage of water- from the :riew tunnel for the Lake Coleridge hydro-etectrid scheme, Since the tunnel was completed a number of small crack 3 have developed W ar ® sufficient to eliow a certain = . ? f . leakage into the hillside. ln 1 * * s nG *' a serious matter, will not affect the power plant at «c«r?n* a i {''***** flips th ft .J , toBD decided to grout the cracks with fine concrete, With V-l object of preventing the t f as possible, This work »;i 1 ?e far by about the middle ofT» three shifts dally, 1 "' th ®

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19261118.2.100

Bibliographic details

New Zealand Herald, Volume LXIII, Issue 19488, 18 November 1926, Page 14

Word Count
135

FAULTS IN WATER TUNNEL. New Zealand Herald, Volume LXIII, Issue 19488, 18 November 1926, Page 14

FAULTS IN WATER TUNNEL. New Zealand Herald, Volume LXIII, Issue 19488, 18 November 1926, Page 14