Article image
Article image
Article image
Article image

AUCKLAND'S NEW RAILWAY DEVIATION TO WESTFIELD. A view, from the Purewa side, of the embankment being constructed across the Orakei Basin. —H. "Wmlrelmann.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19261029.2.131

Bibliographic details

New Zealand Herald, Volume LXIII, Issue 19471, 29 October 1926, Page 13

Word Count
23

AUCKLAND'S NEW RAILWAY DEVIATION TO WESTFIELD. A view, from the Purewa side, of the embankment being constructed across the Orakei Basin. —H. "Wmlrelmann. New Zealand Herald, Volume LXIII, Issue 19471, 29 October 1926, Page 13

AUCKLAND'S NEW RAILWAY DEVIATION TO WESTFIELD. A view, from the Purewa side, of the embankment being constructed across the Orakei Basin. —H. "Wmlrelmann. New Zealand Herald, Volume LXIII, Issue 19471, 29 October 1926, Page 13