Article image
Article image
Article image
Article image

THE OTIRA TUNNEL.

[nr TELEGRAPH. —PRESS ASSOCIATION.] .: GBBiraiOiDTH, Wednesday. According to the Greymouth Star's correspondent, the Otira tunnel is now in 510 ft. The face is very wet, and only six-hour shifts are being worked.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19080903.2.39

Bibliographic details

New Zealand Herald, Volume XLV, Issue 13845, 3 September 1908, Page 5

Word Count
35

THE OTIRA TUNNEL. New Zealand Herald, Volume XLV, Issue 13845, 3 September 1908, Page 5

THE OTIRA TUNNEL. New Zealand Herald, Volume XLV, Issue 13845, 3 September 1908, Page 5