Article image
Article image
Article image
Article image

New Bulls Bridge Under Consideration

MINISTER EXPLAINS DELAY “That has got to go," stated Hon. It. Semple, Minister of Public Works, when referring to the present wooden bridge over tho Rangitikei River at Bulls, in an interview last evening. “It is not in keeping with modern highways standards and we have its replacement under consideration at the present time. •* ’ Mr. Semple added by way of explanation of delays that the Department had to catch up on what other Governments should have done. They were working full steam ahead. Draughtsmen and engineers had been working overtime for a long time aud they simply could not get additional competent engineers or draughtsmen anywhere in Australia or New Zealand. That had been the case for the last three or four years. There had never been so much work done on the highways before, added Mr. Semple. In fact, they had done more in tho last three or lour years than had been accomplished in the previous 25 years. If it hud been done before the pcoplo would now be getting their money’s worth.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MT19390426.2.35

Bibliographic details

Manawatu Times, Volume 64, Issue 96, 26 April 1939, Page 4

Word Count
180

New Bulls Bridge Under Consideration Manawatu Times, Volume 64, Issue 96, 26 April 1939, Page 4

New Bulls Bridge Under Consideration Manawatu Times, Volume 64, Issue 96, 26 April 1939, Page 4