Article image
Article image
Article image
Article image

Counties Joined by Tunnel Under Thames

TASK OF AMAZING EXACTITUDE COMPLETED (British Official Wireless.) Received Thursday, 7 p.m. RUGBY, Oct. 5. Pilot boring of the Dartford to Purfleet tunnel under the Thames which will join the counties of Essex and Kent, was completed yesterday when the last five feet curtain of chalk was broken. There was an error of only threeeighths of an inch in the line and threesixteenth of an inch in tho level of the tunnel when the two borings from the Essex and Kent sides met. The total length of the pilot tunnel is 2832 feet.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MT19381007.2.44

Bibliographic details

Manawatu Times, Volume 63, Issue 237, 7 October 1938, Page 4

Word Count
99

Counties Joined by Tunnel Under Thames Manawatu Times, Volume 63, Issue 237, 7 October 1938, Page 4

Counties Joined by Tunnel Under Thames Manawatu Times, Volume 63, Issue 237, 7 October 1938, Page 4