Article image
Article image
Article image
Article image

Facts and Figures of Major Interest

Interesting facts about the Whirokino deviation bridge are: Cost: £50,000. Cement: 1700 tons or nearly 30,000 bags. Amount ,of concrete: 4910 cubic yards. Length: 3600 feet. Number of spoils: 90. Length of spans: 40 feet. Height of piers: 15 feet. Weight of steel: 750 tons. Total length oa. steel: 300 —400 iniles. Number of piles: 488. Werage length of piles: 30 feet. Saving in distance: 13 chain*. Width of bridge: 2-1 feet Pedestrian refuges: 2.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MT19380405.2.36.5

Bibliographic details

Manawatu Times, Volume 63, Issue 80, 5 April 1938, Page 5

Word Count
81

Facts and Figures of Major Interest Manawatu Times, Volume 63, Issue 80, 5 April 1938, Page 5

Facts and Figures of Major Interest Manawatu Times, Volume 63, Issue 80, 5 April 1938, Page 5