Article image
Article image
Article image
Article image

SOUTHEND TO HAVE A NEW PIER

WILL TAKE TWO YEARS TO BUILD. Southend, the popular and well-known picnicking resort of Londoners, is to have another pier, slates an. English exchange. Plans for a £400,000 structure on the Western Esplanade have been prepared, and a scheme which is organised by a London syndicate will include a Lido bathing pool, sunshine lounges, concert hall and amusement deck, children’s boating and bathing pools. A start is to he made on the structure early next year. It will take two years to complete, and will employ about 2500 men. The pier will he about 800 yards long and from 80 to 250 feel wide.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MT19320723.2.27.6

Bibliographic details

Manawatu Times, Volume LV, Issue 6918, 23 July 1932, Page 5

Word Count
110

SOUTHEND TO HAVE A NEW PIER Manawatu Times, Volume LV, Issue 6918, 23 July 1932, Page 5

SOUTHEND TO HAVE A NEW PIER Manawatu Times, Volume LV, Issue 6918, 23 July 1932, Page 5