Article image
Article image
Article image
Article image

FILLING A GAP.

At. the site of the recent big washout on the Otawhao Koad, Kumeroa, a i>i]>e culvert will take the place of the ohl wooden, culvert which was washed away in the flood. Large concrete pipes arc being laid on foundations also of concrete, and for the new formation a grader is being used as a scoop. The road level is being lowered five feet in order that filling may be utilised for the repair work.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19390121.2.143

Bibliographic details

Manawatu Standard, Volume LIX, Issue 45, 21 January 1939, Page 10

Word Count
78

FILLING A GAP. Manawatu Standard, Volume LIX, Issue 45, 21 January 1939, Page 10

FILLING A GAP. Manawatu Standard, Volume LIX, Issue 45, 21 January 1939, Page 10