Article image
Article image
Article image
Article image

RAILWAY IMPROVEMENT.

CROSSING LOOP IN GORGE. In order to assist in more expeditious and more convenient train-running, a crossing loop is now being constructed on the Manawatu Gorge railway, operations having begun last week. The loop is about a mile and a-half from the Gorge station, and will give a crossing point in the eight and alialf miles distance between Ashhurst and Woodville. The crossing will lie about half-way between those two points and will thus be easily accessible for trains from either direction. Twelve men, mostly from Woodville, are engaged on the building of the loop.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19381212.2.44

Bibliographic details

Manawatu Standard, Volume LIX, Issue 12, 12 December 1938, Page 6

Word Count
97

RAILWAY IMPROVEMENT. Manawatu Standard, Volume LIX, Issue 12, 12 December 1938, Page 6

RAILWAY IMPROVEMENT. Manawatu Standard, Volume LIX, Issue 12, 12 December 1938, Page 6