Article image
Article image
Article image
Article image

TRAFFIC RESUMED.

Received February 9. 10.40 a.m. BRISBANE, Feb. 9. Train traffic over the Tully River has been resumed despite the fact that the flood waters are a foot over the railway bridge.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19330209.2.94

Bibliographic details

Manawatu Standard, Volume LIII, Issue 62, 9 February 1933, Page 8

Word Count
33

TRAFFIC RESUMED. Manawatu Standard, Volume LIII, Issue 62, 9 February 1933, Page 8

TRAFFIC RESUMED. Manawatu Standard, Volume LIII, Issue 62, 9 February 1933, Page 8