Article image
Article image
Article image
Article image
Article image
Article image

ENGINE DERAILED.

IN LONGBURN YARD

While engaged in shunting operations at the Longburn station yard last evening, the engine of the goods train which left Palmerston North for Wellington at 7 p.m. went off the track through a broken rail. No through traffic was affected, as the de- -A fective rail was on a cattle yard siding and, after half an hour’s delay, the t engine was replaced on the metals and the train proceeded on its journey.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/MS19260408.2.45

Bibliographic details

Manawatu Standard, Volume XLVI, Issue 109, 8 April 1926, Page 6

Word Count
78

ENGINE DERAILED. Manawatu Standard, Volume XLVI, Issue 109, 8 April 1926, Page 6

ENGINE DERAILED. Manawatu Standard, Volume XLVI, Issue 109, 8 April 1926, Page 6