Article image
Article image
Article image
Article image

QUARRY OUTPUT

metal from mangatarata 1048 i CUBIC YARDS FOR MONTH The output at the Mangatarata quarry during the month of August was 10481 cubic yards of crushed metal, reported the county engineer, Mr E. Hazledine-Barber, to the September meeting of the Hauraki Plains 'County Council. Distribution was as under: — Roads and highways -- 7421 c. yds. Kopuarahi-jKerepeehi rd. 1501 c. yds. Sales ex hopper — —- 1551 c. yds. Total —.—- 10481 c. yds. “The secondary crusher has been dismantled for repairs and to avoid closing down, the primary crusher is being used for crushing 2-3 in. metal for widening Kopuarahi-Kerepeehi roa,” added the report.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/HPGAZ19451001.2.34

Bibliographic details

Hauraki Plains Gazette, Volume 54, Issue 32628, 1 October 1945, Page 6

Word Count
102

QUARRY OUTPUT Hauraki Plains Gazette, Volume 54, Issue 32628, 1 October 1945, Page 6

QUARRY OUTPUT Hauraki Plains Gazette, Volume 54, Issue 32628, 1 October 1945, Page 6