Article image
Article image
Article image
Article image
Article image
Article image

SHORTAGE OF POWER

POSITION IN CANTERBURY. LAKE COLERIDGE: SCHEME. (Bv Telegraph —Press Association.) CHRISTCHURCH, Aug. 25. Eaced with a shortage of electric power through an unprecedented drought in the back country and: tlie consequent fall in the level of Take Coleridge, the Public Works Department has asked the Christchurch Tramways Board to bring into operation from to-morrow its own steam generating plant, and is appealing to the public for strict economy in the use of domestic current. The position is not yet serious, but should the present drought continue for the next few weeks the level of the lake may be so reduced that the maximum load at present existing could not be carried:. The diversion of the River Acheron, which will provide, a considerable additional .supply of water, is being put in hand immediately.

The. Tramway Board’s plant has not been used for any length of time since the Lake Coleridge scheme was first completed, but lias frequently been in use for one or two days. If the tramway load exoeds 1000 kilowatts, which is the maximum load it can produce, the balance of power will be drawn from Lake Coleridge.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/HAWST19300826.2.59

Bibliographic details

Hawera Star, Volume L, 26 August 1930, Page 6

Word Count
192

SHORTAGE OF POWER Hawera Star, Volume L, 26 August 1930, Page 6

SHORTAGE OF POWER Hawera Star, Volume L, 26 August 1930, Page 6