GOLD MINING
NEW RIVER GOLD DREDGING COMPANY LTD. Messrs Anderson Ltd., report that the contractors for the construction at the dredge for "he New River Gold Dredging Co. Ltd., report tihat orders have been placed with Hadfields London, for the to], and bottom tumblers, Diesel engine and buckets. The details of the pontoon, are now being set out. GILLESPIE’S BEACH DREDGE. WEH EKA, June 10. The Gilespie’s Beach Dredge return lasi week was 270 z. 12dwt. for 135 hours’ work. MATAKI RETURN. AUCKLAND, June 10. The Malaki dredge return for the week ending 9th inst was 22ozs for 88 hours’ work.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/GRA19350611.2.60
Bibliographic details
Grey River Argus, 11 June 1935, Page 7
Word Count
101GOLD MINING Grey River Argus, 11 June 1935, Page 7
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.