Article image
Article image
Article image
Article image

SPEED MANIACS

ON MAIN SOUTH ROAD. SERIOUS COMPLAINTS IN COOK COUNTY. WORKMEN’S LIVES ENDANGERED, A considerable amount of inconveiP ience is being caused during the progress of tar sealing the Main South Road from the Borough boundary to Matawhero saleyards by the fast-mov-ing motor traffic,” stated the Cook County Engineer (Mr. J. J. Keane) in a report to the Council “Many of the drivers,” lie said," “when travelling at a high speed, fail to keep to the correct side of the road, and in some cases heavily-laden vehicles have crossed and re-crossed the metal after it lias, been prepared to receive the bitumen, with the result that the surface is badly corrugated and requires additional work to repair the damage. Ample room is available along the sides for all traffic. A watch will be kept on all traffic during the next few days and action will be taken against all persons caught oVcr-specding or failing to slow down when required to do so.” The Engineer (Mr Keane) said that only the other day a.car travelling at over 40 miles an hour passed down the road where the work was being carried out and nearly knocked several men over. Cr. Witters said that a case had come under his notice recently where a fast-travelling car had caught one of the men working on that stretch on the leg with the mudguard. It was decided that notice boards bo erected at each end of the work ancl that action be taken against motorists hindering the prosecution of tile contract.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/GIST19260128.2.35

Bibliographic details

Gisborne Times, Volume LXIV, Issue 11013, 28 January 1926, Page 6

Word Count
257

SPEED MANIACS Gisborne Times, Volume LXIV, Issue 11013, 28 January 1926, Page 6

SPEED MANIACS Gisborne Times, Volume LXIV, Issue 11013, 28 January 1926, Page 6