Article image
Article image
Article image
Article image

BUILT UNDER BLITZ

NEW WATERLOO BRIDGE (9.30 a.m.) LONDON, Aug. 11. Buses and taxis will crdss the new Waterloo Bridge for the first time tomorrow when two traffic lines will be opened from each direction.. The bridge will have six lines of traffic when completed. One hundred workmen who went on building thoughout the blitz toasted the bridge to-day with three barrels of beer.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/GISH19420812.2.27

Bibliographic details

Gisborne Herald, Volume LXIX, Issue 20860, 12 August 1942, Page 3

Word Count
64

BUILT UNDER BLITZ Gisborne Herald, Volume LXIX, Issue 20860, 12 August 1942, Page 3

BUILT UNDER BLITZ Gisborne Herald, Volume LXIX, Issue 20860, 12 August 1942, Page 3