Article image
Article image
Article image
Article image

Tunncllersat work with xi compressed air drill excavating on one of the air-raid shelters in the Hobson Street gully.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19420224.2.75.1

Bibliographic details

Evening Post, Volume CXXXIII, Issue 46, 24 February 1942, Page 6

Word Count
19

Tunncllersat work with xi compressed air drill excavating on one of the air-raid shelters in the Hobson Street gully. Evening Post, Volume CXXXIII, Issue 46, 24 February 1942, Page 6

Tunncllersat work with xi compressed air drill excavating on one of the air-raid shelters in the Hobson Street gully. Evening Post, Volume CXXXIII, Issue 46, 24 February 1942, Page 6