Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

GOLD DREDGING RESULTS

(By Telegraph—Press Association.)

WESTPORT, This Day. Addison's Flat reports the fortnight ended October 12, worked 33 shifts, return 260z.

Grey River Dredging Co., Ltd., reports a return of 2070z from 99,937 cubic yards in 134& hours. Austral-N.Z. return, October 1 to 12 inclusive, was 8230z for 235 houfs. The dredge had to be stopped for about four days in which to effect repairs.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19401018.2.142.12

Bibliographic details

Evening Post, Volume CXXX, Issue 95, 18 October 1940, Page 10

Word Count
66

GOLD DREDGING RESULTS Evening Post, Volume CXXX, Issue 95, 18 October 1940, Page 10

GOLD DREDGING RESULTS Evening Post, Volume CXXX, Issue 95, 18 October 1940, Page 10