Article image
Article image
Article image
Article image

WANGANUI HOSPITAL

The 33-bed isolation hospital block at Wanganui will be completed in about six weeks, states "The Post's" representative. The block will cost £15,000, and has been especially constructed to resist earthquake and fire. In the corridors, bulbs light only the floor, thus avoiding glare through fanlights into the wards. The building is steam heated and modern electric appliances are to be installed.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19380629.2.57

Bibliographic details

Evening Post, Volume CXXV, Issue 151, 29 June 1938, Page 10

Word Count
64

WANGANUI HOSPITAL Evening Post, Volume CXXV, Issue 151, 29 June 1938, Page 10

WANGANUI HOSPITAL Evening Post, Volume CXXV, Issue 151, 29 June 1938, Page 10