Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

LONDON TUBE EXTENSIONS

(British Official Wireless.)

RUGBY, February 1.

The London Passenger Transport Board has signed a contract for the lengthening of the platforms at four stations on the London Underground Railway. • The work is part of a- £40,000,000 extension and development scheme which includes the reconstruction of this line.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19380203.2.83

Bibliographic details

Evening Post, Volume CXXV, Issue 28, 3 February 1938, Page 9

Word Count
50

LONDON TUBE EXTENSIONS Evening Post, Volume CXXV, Issue 28, 3 February 1938, Page 9

LONDON TUBE EXTENSIONS Evening Post, Volume CXXV, Issue 28, 3 February 1938, Page 9