Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

HOTEL CECIL BLOCK

NEW CENTRAL SECTION

Demolitions preparatory to the erection of a new central section of tho Hotel Cecil have commenced. This section has a frontage to Lambton Quay of 72 feet by a depth of some 30 feet. The now building will be of two storeys only, a ground and first floor, but the foundations will provide for the erection of lour more floors, making six in all.

The tender of Mr. G. Tcmplcton has ■been accepted for the new section in reinforced concrete. The plans have been prepared by Mr. John Swan.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19340811.2.91

Bibliographic details

Evening Post, Volume CXVIII, Issue 36, 11 August 1934, Page 10

Word Count
95

HOTEL CECIL BLOCK Evening Post, Volume CXVIII, Issue 36, 11 August 1934, Page 10

HOTEL CECIL BLOCK Evening Post, Volume CXVIII, Issue 36, 11 August 1934, Page 10