Article image
Article image
Article image
Article image

OKARITO RETURNS.

Okarito Five-Mile Beach Gold Dredging Co., Ltd., forwards to the Stock Exchange Association the following report covering the four weeks from 10th September to Bth October:—Total gold won, 130oz 18 dwt; total time worked, 437 hours; total non-working time, 139 hours (including' two days shifting pipe line); total yardage treated, 25,300, an average of 5S cubic yards per hour; average value of ground (on basis of gold worth £4 per ounce), 5d per cubic yard.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19321028.2.110.5

Bibliographic details

Evening Post, Volume CXIV, Issue 103, 28 October 1932, Page 10

Word Count
77

OKARITO RETURNS. Evening Post, Volume CXIV, Issue 103, 28 October 1932, Page 10

OKARITO RETURNS. Evening Post, Volume CXIV, Issue 103, 28 October 1932, Page 10