ALMOST FINISHED
THE STRATFORD LINE
(By Telegraph.—Press 'Association.)
STRATFORD, This Day.
The last' tunnel on; the Stratford Main. Trunk line was pierced this morning, making a signal step towards an early completion of line. There now remains only two and a quarter chains of concrete- lining to complete the construction work.
* It ;is anticipated that Public Works trains will be running over the line in the S-ery near future.-
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19320730.2.89
Bibliographic details
Evening Post, Volume CXIV, Issue 26, 30 July 1932, Page 14
Word Count
69ALMOST FINISHED Evening Post, Volume CXIV, Issue 26, 30 July 1932, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.