Article image
Article image
Article image
Article image

RIVER BREAKS THROUGH

DELAY AT ARAPUNI WORKS (By Telegraph.) (Special to "The Evening Pest.' 1) AUCKLANJ), This Day. A leakage in the foundations of the power house at the Arapuni hydro-electric works is still causing the contractors, Sir W. G. Armstrong, Witworth, Ltd., considerable concern. The leakage is through the boulders at the bottom, and for the third time the river has broken through. This has occasioned considerable delay in the operations. An attempt to stem the inflow of the water from the river is now being made by driving' steel piles to the rock foundation, behind which there will be a filling of concrete.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19270314.2.106

Bibliographic details

Evening Post, Volume CXIII, Issue 61, 14 March 1927, Page 10

Word Count
105

RIVER BREAKS THROUGH Evening Post, Volume CXIII, Issue 61, 14 March 1927, Page 10

RIVER BREAKS THROUGH Evening Post, Volume CXIII, Issue 61, 14 March 1927, Page 10