Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

FLOOD DAMAGE

INTERRUPTIONS ON RAILWAYS

SEVERAL DAYS BEFORE REPAIRS COMPLETED,

(BI TELEGRAPH.—PRESS ASSOCIATION.)' LEVIN, 25th May.

■ The interruption.- to the railway line near Shannon is the result of a scour under the piles of a bridge deck. It was shored up with railway sleepers, enabling carriages to be pushed across' one by one, the passengers walking. The "Limited" passed through six hours late. It will be two or three days before the bridge is restored sufficieutly'to allow engines to pass over it. '

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19250526.2.67

Bibliographic details

Evening Post, Volume CIX, Issue 121, 26 May 1925, Page 7

Word Count
82

FLOOD DAMAGE Evening Post, Volume CIX, Issue 121, 26 May 1925, Page 7

FLOOD DAMAGE Evening Post, Volume CIX, Issue 121, 26 May 1925, Page 7