Article image
Article image
Article image
Article image

THAMES DEEP LEVELS.

#UMPS TO WORK AT 1000 FEET. [BT TELEGKAPH— -PBKSB ASSOCIATION.} AUCKLAND, 6th May. An important move in the direction of the opening up of the Thames deep levels was taken to-day ; when the Thames Drainage Board in committee decided to pump down to the 1000 feet level in the Queen of Beauty shaft.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19090507.2.29

Bibliographic details

Evening Post, Volume LXXVII, Issue 107, 7 May 1909, Page 3

Word Count
56

THAMES DEEP LEVELS. Evening Post, Volume LXXVII, Issue 107, 7 May 1909, Page 3

THAMES DEEP LEVELS. Evening Post, Volume LXXVII, Issue 107, 7 May 1909, Page 3