Big River Report
Big River Gold Mines, Limited, report for the week ended July 7: —No. 5 level: North stope, stoping continued; producing stone of high grade. South stope, the last portion is being taken out under No. -1 level. Centre stope, tilling is in progress. Shaft, the No. 6 chamber is almost completed; a small amount of spoil is to be removed and Hat sheets to lay. Battery, 73 tong of stone were sent to the battery.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19380711.2.149.10
Bibliographic details
Dominion, Volume 31, Issue 243, 11 July 1938, Page 14
Word Count
78Big River Report Dominion, Volume 31, Issue 243, 11 July 1938, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.