Article image
Article image
Article image
Article image

Renovating Customhouse Quay.— Following on the construction of a safety zone and a new tram shelter in the Post Office Square section of Customhouse Quay, a start has been made in altering the surface of the road. The old wooden blocks are being removed and the surface laid down in bitumen and concrete. A footpath is also to be provided on the waterfront side. —“Dominion photo.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19310904.2.27.3

Bibliographic details

Dominion, Volume 24, Issue 291, 4 September 1931, Page 7

Word Count
66

Renovating Customhouse Quay.—Following on the construction of a safety zone and a new tram shelter in the Post Office Square section of Customhouse Quay, a start has been made in altering the surface of the road. The old wooden blocks are being removed and the surface laid down in bitumen and concrete. A footpath is also to be provided on the waterfront side. —“Dominion photo. Dominion, Volume 24, Issue 291, 4 September 1931, Page 7

Renovating Customhouse Quay.—Following on the construction of a safety zone and a new tram shelter in the Post Office Square section of Customhouse Quay, a start has been made in altering the surface of the road. The old wooden blocks are being removed and the surface laid down in bitumen and concrete. A footpath is also to be provided on the waterfront side. —“Dominion photo. Dominion, Volume 24, Issue 291, 4 September 1931, Page 7