Article image
Article image
Article image
Article image

BOROUGH MAINTENANCE

Eastbourne Report Kh?w«teraenrWtyW of sand were c® rtc 'l spread over the rubbish, and 80 cubic vards used for filling up Pupn street. One hundred and twenty <mbm yarfs of rock were spread on the footpatns ana rnndßide fl channel formed, and gravel InJead on the pa?h in front of the gate, wavs, and timber used on the fences to prevent the sand and rock fating on the low sections. Two sumps were constructed of con crete in Main Road, attention had been devoted to the groynes, and all se “weed removed. The second groyne at the southern end was badly damaged early ini the month, but no timber was lost. Otherwise thev were in good order. Work has been done on the recreation ground, principally of a maintenance and tidying nature.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19300726.2.159.8

Bibliographic details

Dominion, Volume 23, Issue 257, 26 July 1930, Page 25

Word Count
134

BOROUGH MAINTENANCE Dominion, Volume 23, Issue 257, 26 July 1930, Page 25

BOROUGH MAINTENANCE Dominion, Volume 23, Issue 257, 26 July 1930, Page 25