Article image
Article image
Article image
Article image

Martha Hill

The Downer subsidiary, Downer Mining, has signed a ' mining contract with the Waihi Gold Mining Company for the Martha Hill gold mine in Waihi. Downer Mining signed a five-year contract to carry out the mining and transport work with Waihi Gold, the managers of the mining operation. It will be responsible for the opencast mining work, the transport of ore-bearing material, and waste rock, using a two kilometre conveyer system. The company will shift 10M cubic metres of ore and waste.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19880220.2.133.21

Bibliographic details

Press, 20 February 1988, Page 28

Word Count
83

Martha Hill Press, 20 February 1988, Page 28

Martha Hill Press, 20 February 1988, Page 28